{"id":28400,"date":"2025-01-21T11:17:45","date_gmt":"2025-01-21T10:17:45","guid":{"rendered":"https:\/\/www.modelical.com\/?p=28400"},"modified":"2025-01-21T16:46:05","modified_gmt":"2025-01-21T15:46:05","slug":"bim-management-for-hospital-project","status":"publish","type":"post","link":"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/","title":{"rendered":"BIM management office in the design phase of a 300,000+ sqm hospital project"},"content":{"rendered":"<h2><strong>Complete project coordination from the ACC Coordination Module.<\/strong><\/h2>\n<p><span style=\"font-weight: 400;\">In 2023, our client, an architecture studio specializing in designing and building healthcare spaces, was commissioned to design a hospital spanning over 300,000 m\u00b2.<\/span> <span style=\"font-weight: 400;\">The entire project was carried out using the BIM methodology, with all disciplines working collaboratively within the cloud-based common data environment, ACC.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Modelical was hired as the BIM management office for this project. Our services ranged from quality audits of the models and geometric coordination of the various disciplines to generating clash matrices directly in the ACC Model Coordination module.<\/span><\/p>\n<h3>Quality Audits for Hospital Project Models in ACC for Construction Cost Estimation<\/h3>\n<p><span style=\"font-weight: 400;\">In the initial phase, the Modelical team defined all the auditing tools, workflows, and processes necessary to ensure that the project met the requirements outlined in the BEP.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">In the following phase, the Modelical team conducted model audits at all key stages of the project. These audits included:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reviewing the models of each discipline: structure, architecture, and MEP.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Verifying the coding of numerous model elements to ensure compliance with the final client\u2019s standards and enabling accurate construction cost estimation.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">In addition to these comprehensive audits, the Modelical team maintained weekly follow-ups with all stakeholders involved.<\/span><\/p>\n<h3>Project Coordination from the ACC Module and Development of an Ad-Hoc Clash Matrix Procedure<\/h3>\n<p><span style=\"font-weight: 400;\">As established in the BEP, the coordination of the entire project had to be performed within the dedicated ACC module. To this end, the Modelical team developed a custom workflow in ACC. This procedure included:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Analyzing the clash matrix defined in the BEP.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Identifying the corresponding groups of clashes.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Setting up specific 3D publication views filtered by categories and\/or elements to address the identified clash groups.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Creating a workspace within the ACC Model Coordination module for the project&#8217;s geometric coordination.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Configuring coordination views directly in the ACC Model Coordination module, organizing clash groups (publication views) by severity levels as defined in the matrix (Low, Medium, and\/or High).<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Implementing a naming convention standard that ensured:<\/span>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">Proper representation of the BEP clash matrix in ACC\u2019s Model Coordination.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">Organization of the different coordination views for clash detection, considering the severity of issues and clash groups.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">Traceability and organization of issues detected during the coordination process.<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-28415 size-full\" src=\"https:\/\/www.modelical.com\/wp-content\/uploads\/2025\/01\/ACC_model_workflow_detailled_2_850.png\" alt=\"\" width=\"850\" height=\"620\" srcset=\"https:\/\/www.modelical.com\/wp-content\/uploads\/2025\/01\/ACC_model_workflow_detailled_2_850.png 850w, https:\/\/www.modelical.com\/wp-content\/uploads\/2025\/01\/ACC_model_workflow_detailled_2_850-480x350.png 480w, https:\/\/www.modelical.com\/wp-content\/uploads\/2025\/01\/ACC_model_workflow_detailled_2_850-768x560.png 768w\" sizes=\"(max-width: 850px) 100vw, 850px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-weight: 400;\">\u00a0<\/span>Key Outcomes and Achievements<\/h3>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Geometric coordination, or clash detection, was accessible in real time by all project stakeholders due to collaborative work directly in ACC.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The developed procedure is fully applicable to other project types (residential, hospitality, industrial) and represents a significant advancement in how the ACC coordination module is utilized.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Complete project coordination from the ACC Coordination Module. In 2023, our client, an architecture studio specializing in designing and building healthcare spaces, was commissioned to design a hospital spanning over 300,000 m\u00b2. The entire project was carried out using the BIM methodology, with all disciplines working collaboratively within the cloud-based common data environment, ACC. Modelical [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":28413,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[707],"tags":[654,662,411],"class_list":["post-28400","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cases","tag-industry-architects-engineers","tag-industry-owners-operators","tag-technology-revit"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BIM management office in the design phase of a 300,000+ sqm hospital project - Modelical<\/title>\n<meta name=\"description\" content=\"Our services included quality audits of the models, geometric coordination of the various disciplines and complete project coordination from the ACC Coordination Module.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BIM management office in the design phase of a 300,000+ sqm hospital project - Modelical\" \/>\n<meta property=\"og:description\" content=\"Our services included quality audits of the models, geometric coordination of the various disciplines and complete project coordination from the ACC Coordination Module.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Modelical\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Modelical\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-21T10:17:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-21T15:46:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.modelical.com\/wp-content\/uploads\/2025\/01\/ACC_model_coordination_Workflow_2_400x250.png\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"250\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Mauricio Zambrano\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@modelical\" \/>\n<meta name=\"twitter:site\" content=\"@modelical\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mauricio Zambrano\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/bim-management-for-hospital-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/bim-management-for-hospital-project\\\/\"},\"author\":{\"name\":\"Mauricio Zambrano\",\"@id\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/#\\\/schema\\\/person\\\/43c5ff89c402fb4ef156387d1258d9d6\"},\"headline\":\"BIM management office in the design phase of a 300,000+ sqm hospital project\",\"datePublished\":\"2025-01-21T10:17:45+00:00\",\"dateModified\":\"2025-01-21T15:46:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/bim-management-for-hospital-project\\\/\"},\"wordCount\":434,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/bim-management-for-hospital-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.modelical.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/ACC_model_coordination_Workflow_2_400x250.png\",\"keywords\":[\"Ind Architects &amp; Engineers\",\"Ind Owners &amp; Operators\",\"Tec Revit\"],\"articleSection\":[\"Case studies\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.modelical.com\\\/en\\\/bim-management-for-hospital-project\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/bim-management-for-hospital-project\\\/\",\"url\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/bim-management-for-hospital-project\\\/\",\"name\":\"BIM management office in the design phase of a 300,000+ sqm hospital project - Modelical\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/bim-management-for-hospital-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/bim-management-for-hospital-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.modelical.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/ACC_model_coordination_Workflow_2_400x250.png\",\"datePublished\":\"2025-01-21T10:17:45+00:00\",\"dateModified\":\"2025-01-21T15:46:05+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/#\\\/schema\\\/person\\\/43c5ff89c402fb4ef156387d1258d9d6\"},\"description\":\"Our services included quality audits of the models, geometric coordination of the various disciplines and complete project coordination from the ACC Coordination Module.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.modelical.com\\\/en\\\/bim-management-for-hospital-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/bim-management-for-hospital-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.modelical.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/ACC_model_coordination_Workflow_2_400x250.png\",\"contentUrl\":\"https:\\\/\\\/www.modelical.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/ACC_model_coordination_Workflow_2_400x250.png\",\"width\":400,\"height\":250},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/\",\"name\":\"Modelical\",\"description\":\"We build information\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/#\\\/schema\\\/person\\\/43c5ff89c402fb4ef156387d1258d9d6\",\"name\":\"Mauricio Zambrano\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3a3e8675e89a38f8e0a0e72df54ea7cb4f37160df0e34e25a7bf27775fd4ad0b?s=96&d=initials&r=g&initials=mz\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3a3e8675e89a38f8e0a0e72df54ea7cb4f37160df0e34e25a7bf27775fd4ad0b?s=96&d=initials&r=g&initials=mz\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3a3e8675e89a38f8e0a0e72df54ea7cb4f37160df0e34e25a7bf27775fd4ad0b?s=96&d=initials&r=g&initials=mz\",\"caption\":\"Mauricio Zambrano\"},\"url\":\"https:\\\/\\\/www.modelical.com\\\/en\\\/author\\\/mauricio-zambrano\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BIM management office in the design phase of a 300,000+ sqm hospital project - Modelical","description":"Our services included quality audits of the models, geometric coordination of the various disciplines and complete project coordination from the ACC Coordination Module.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/","og_locale":"en_US","og_type":"article","og_title":"BIM management office in the design phase of a 300,000+ sqm hospital project - Modelical","og_description":"Our services included quality audits of the models, geometric coordination of the various disciplines and complete project coordination from the ACC Coordination Module.","og_url":"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/","og_site_name":"Modelical","article_publisher":"https:\/\/www.facebook.com\/Modelical\/","article_published_time":"2025-01-21T10:17:45+00:00","article_modified_time":"2025-01-21T15:46:05+00:00","og_image":[{"width":400,"height":250,"url":"https:\/\/www.modelical.com\/wp-content\/uploads\/2025\/01\/ACC_model_coordination_Workflow_2_400x250.png","type":"image\/png"}],"author":"Mauricio Zambrano","twitter_card":"summary_large_image","twitter_creator":"@modelical","twitter_site":"@modelical","twitter_misc":{"Written by":"Mauricio Zambrano","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/#article","isPartOf":{"@id":"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/"},"author":{"name":"Mauricio Zambrano","@id":"https:\/\/www.modelical.com\/en\/#\/schema\/person\/43c5ff89c402fb4ef156387d1258d9d6"},"headline":"BIM management office in the design phase of a 300,000+ sqm hospital project","datePublished":"2025-01-21T10:17:45+00:00","dateModified":"2025-01-21T15:46:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/"},"wordCount":434,"commentCount":0,"image":{"@id":"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.modelical.com\/wp-content\/uploads\/2025\/01\/ACC_model_coordination_Workflow_2_400x250.png","keywords":["Ind Architects &amp; Engineers","Ind Owners &amp; Operators","Tec Revit"],"articleSection":["Case studies"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/","url":"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/","name":"BIM management office in the design phase of a 300,000+ sqm hospital project - Modelical","isPartOf":{"@id":"https:\/\/www.modelical.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/#primaryimage"},"image":{"@id":"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.modelical.com\/wp-content\/uploads\/2025\/01\/ACC_model_coordination_Workflow_2_400x250.png","datePublished":"2025-01-21T10:17:45+00:00","dateModified":"2025-01-21T15:46:05+00:00","author":{"@id":"https:\/\/www.modelical.com\/en\/#\/schema\/person\/43c5ff89c402fb4ef156387d1258d9d6"},"description":"Our services included quality audits of the models, geometric coordination of the various disciplines and complete project coordination from the ACC Coordination Module.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.modelical.com\/en\/bim-management-for-hospital-project\/#primaryimage","url":"https:\/\/www.modelical.com\/wp-content\/uploads\/2025\/01\/ACC_model_coordination_Workflow_2_400x250.png","contentUrl":"https:\/\/www.modelical.com\/wp-content\/uploads\/2025\/01\/ACC_model_coordination_Workflow_2_400x250.png","width":400,"height":250},{"@type":"WebSite","@id":"https:\/\/www.modelical.com\/en\/#website","url":"https:\/\/www.modelical.com\/en\/","name":"Modelical","description":"We build information","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.modelical.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.modelical.com\/en\/#\/schema\/person\/43c5ff89c402fb4ef156387d1258d9d6","name":"Mauricio Zambrano","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/3a3e8675e89a38f8e0a0e72df54ea7cb4f37160df0e34e25a7bf27775fd4ad0b?s=96&d=initials&r=g&initials=mz","url":"https:\/\/secure.gravatar.com\/avatar\/3a3e8675e89a38f8e0a0e72df54ea7cb4f37160df0e34e25a7bf27775fd4ad0b?s=96&d=initials&r=g&initials=mz","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3a3e8675e89a38f8e0a0e72df54ea7cb4f37160df0e34e25a7bf27775fd4ad0b?s=96&d=initials&r=g&initials=mz","caption":"Mauricio Zambrano"},"url":"https:\/\/www.modelical.com\/en\/author\/mauricio-zambrano\/"}]}},"_links":{"self":[{"href":"https:\/\/www.modelical.com\/en\/wp-json\/wp\/v2\/posts\/28400","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.modelical.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.modelical.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.modelical.com\/en\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.modelical.com\/en\/wp-json\/wp\/v2\/comments?post=28400"}],"version-history":[{"count":0,"href":"https:\/\/www.modelical.com\/en\/wp-json\/wp\/v2\/posts\/28400\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.modelical.com\/en\/wp-json\/wp\/v2\/media\/28413"}],"wp:attachment":[{"href":"https:\/\/www.modelical.com\/en\/wp-json\/wp\/v2\/media?parent=28400"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.modelical.com\/en\/wp-json\/wp\/v2\/categories?post=28400"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.modelical.com\/en\/wp-json\/wp\/v2\/tags?post=28400"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}