Electric Tower parametric design and modelling
Bruno Castillon 12/05/2022 Works

Electric Tower Parametric Modelling

Parametric analysis of electrical towers to establish their optimal shape in early stages. The algorithm works minimizing the combination of...

Ind Construction, Tec Grasshopper, Tec Rhino
BIM Model updating for As-built
Alberto Ramos 18/12/2018 Works

Hotel CP de la Bergère

Once the construction of the Hotel CP de la Bergère was finished, IMPLENIA wants to update BIM Models according to received 2D documentatio...

Ind Construction
Augmented reality mobile app development
Roberto Molinos 17/09/2018 Works

HP Augmented Prints

Minimum Viable Product development of a web application that allows connection between printed sheets and their digital counterparts in a Co...

Ind Owners & Operators
Interactive and Virtual Reality project
Bego Gassó 02/11/2017 Works

Interactive model of Riyadh Metro

Modelical developed an interactive application for the validation of the final finishes of Riyadh metro stations....

Ind Architects & Engineers
BIM coordination of disciplines
Almudena Gómez 05/07/2017 Works

Development Bank of Latin America

Modelical was brought in by Mallol & Mallol as an external consultant to provide guidance, advice and development capacity. The main service...

Ind Architects & Engineers
BIM strategy and implementation for retail
Frantxo Tabanera 03/07/2017 Works

BIM Implementation at GRUPO VIPS

Modelical performed the BIM Implementation in Grupo VIPS. The contract consisted of two items: The first one was focused on consistency amo...

Ind Owners & Operators
modelling issues solving for special waving cladding
Sarai Zaballa 22/06/2017 Works

Doha Metro Green and Red Line

Modelical was brought in by SENER to study and solve the modelling issues around 6 km of special waving cladding along the elevated tracks. ...

Ind Architects & Engineers
As-Built MEP modelling for Aerospace mounting facilities
Roberto Molinos 15/06/2017 Works

Airbus Beluga Hangar

As-Built MEP modelling in order to show onsite works modifications of the project for Beluga airplane hangar in Getafe. The final goal was t...

Ind Architects & Engineers
BIM Implementation for real estate developers
Sarai Zaballa 01/06/2017 Works

Ebrosa Real Estate Corporate

Global BIM Implementation for the property developer. Business model analysis, standards development: guidelines and BIM protocol, codificat...

Ind Developers
BIM advanced process automation
Frantxo Tabanera 24/05/2017 Works

ECC Masterplan in Delhi

Modelical supported IDOM engineering to meet the BIM requirements for the Masterplan in Dwarka, Dehli, including Drafting, Basic and Bidding...

Ind Architects & Engineers
Airport project modelling
Cecilia Santana 05/05/2017 Works

Tabuk Airport Extension

IDOM office in Madrid contacted Modelical to give support during development of Tabuk Airport refurbishment project....

Ind Architects & Engineers
BIM Implantation for bridge and viaduct project
Frantxo Tabanera 24/04/2017 Works

Infrastructure BIM Implementation

Modelical has collaborated with SENER developing a particular BIM Implantation for bridge and viaduct project developement....

Ind Architects & Engineers
evaluation estructural with BIM
Oriol Vidal 05/04/2017 Works

BIM Structural Evaluation

Modelical has collaborated in the BIM implementation of IDOM Vitoria team to combine structural evaluation with BIM methodology....

Ind Architects & Engineers
BIM implementation in Engineering companies
Frantxo Tabanera 16/02/2017 Works

IDOM Corporate

Modelical was hired in by IDOM / ACXT to establish the culture, processes, and training required to implement the BIM methodology in its Mad...

Ind Architects & Engineers
BIM onsite at LOD400
Roberto Molinos 14/02/2017 Works

Hangar for Airbus

Complete onsite support for all BIM related tasks. The detail project had been developed up to LOD400 using Revit and SACYR requested a team...

Ind Architects & Engineers
BIM 4D
Oriol Vidal 23/01/2017 Works

Children Hospital Dublin

BIM 4D Modelling of the Children Hospital in Dublin for FCC. The 4D Model should serve for two purposes: reviewing the proposed construction...

Ind Architects & Engineers
generation of parametric detail component for TEKLA
Oriol Vidal 23/01/2017 Works

Steel Connection Automation

Custom components creation for TEKLA detailing, and AutoConnection implantation...

Ind Architects & Engineers
BIM support for office building
Alberto Ramos 23/01/2017 Works

Pioneer Park in Leicester

Modelical has supported IDOM UK in the development of the detail design of a 2000 s.q.m. office building in Leicester....

Ind Architects & Engineers
Modelling at a schematic level for proposal
Frantxo Tabanera 11/01/2017 Works

Zaragoza New School of Philosophy

The headquarters of IDOM in Zaragoza contacted Modelical for the preparation of a deliverable for a competition. Specifically, we modelled a...

Ind Architects & Engineers
BIM Training during project development
Sarai Zaballa 02/12/2016 Works

Inmobiliaria Espacio Corporate

Inmobiliaria Espacio contacts Modelical for training of his internal team during the project development of the fifth tower. The main goal i...

Ind Developers