Development of the MEP and Structure LOD200 BIM models for six buildings of lenia 3 and 6 Metro Santiago de Chile
Sarai Zaballa 10/04/2015 Works

Santiago Metro L6 and L3 Depots

Development of the MEP and Structure LOD200 BIM models for six buildings in the depot complex of Linea 3 and Linea 6 Metro Santiago de Chile...

Ind Architects & Engineers
Revit special families creation for constructive elements in a housing project
Sarai Zaballa 14/12/2014 Works

NW Cambridge Housing

Modelical led an on-site BIM basic training specific for this dwelling project in Cambridge. ABA also requested Modelical to review the exis...

Ind Architects & Engineers
Modelling and still visualisations of an aircraft hangar
Roberto Molinos 05/11/2014 Works

Hangar for Globalia in Mallorca

Modelling and still visualisations of a Hangar fo Globalia in Mallorca....

Ind Architects & Engineers
visualization of the construction process of the TB03 building of the ITER Project
Roberto Molinos 10/09/2014 Works

ITER TB03

Ferrovial asked Modelical to help them with the visualization of the construction process of the TB03 building, part of the complex of the I...

Ind Construction
4D BIM Model
Roberto Molinos 05/09/2014 Works

Construction Works in Lusail

Modelical provided proposal-stage BIM services to help SACYR in the bid of this Construction Works in Lusail. The project was modeled to p...

Ind Construction
proposal stage BIM services for Lusail towers
Roberto Molinos 01/09/2014 Works

Construction Works CP07C1A in Lusail

Modelical provided proposal-stage BIM services to help SACYR in the bid of this Construction Works in Lusail. The project was modeled to p...

Ind Construction
BIM implementation for Rafael de la-Hoz Arquitectos
Roberto Molinos 23/07/2014 Works

Rafael de la Hoz Corporate

Rafael de Lahoz Architects team hired Modelical to start the BIM Implementation in their headquarter in Madrid. Office-wide implementation i...

Ind Architects & Engineers
Still visualisations of Pisco Harbour
Roberto Molinos 15/05/2014 Works

Port in Pisco

BIM modelling and still visualisations of Pisco Harbour for Sener....

Ind Architects & Engineers
4D simulation content for tender support of the Guggenheim Museum in Abu Dhabi
Roberto Molinos 01/04/2014 Works

Guggenheim Museum in Abu Dhabi

Modelical provided complete proposal-stage BIM services to help FCC and its Partners in the study and bid of the new Frank Gehry museum in A...

Ind Construction
Concept design and BIM modelling of railway station
Roberto Molinos 28/12/2013 Works

Bijwasan Railway Station

Concept design and BIM modelling collaboration for Sener....

Ind Architects & Engineers
BIM strategy project of a new Campus for UDSN
Sarai Zaballa 03/12/2013 Works

BOMA corporate

Design and implementation of a BIM strategy for BAC Madrid around the project of a new Campus for UDSN in the Republic of Congo. Modelical p...

Ind Architects & Engineers
Parametric model of Footbridges over Rimac River
Roberto Molinos 28/11/2013 Works

Footbridges over Rimac River

Modelical was hired by CESMA Ingenieros to help them streamline their design of 6 different footbridges over Rimac River in Lima, Perú. The...

Ind Architects & Engineers
visualisation services for a combined cycle plant in Malaysia
Roberto Molinos 30/10/2013 Works

Combined cycle in Malaysia

Still visualisations of a combined cycle plant in Malaysia for Sener....

Ind Architects & Engineers
BIM partner for tender process of the Marques de Valdecilla Hospital Extension
Sarai Zaballa 10/10/2013 Works

Marques de Valdecilla Hospital Extension

Ferrovial approached Modelical to assist them with a tender process. So Modelical helped with the BIM Modelling of the project proposal, tha...

Ind Construction
virtual reality tool for interactive event planning
Juan Manuel Perez 31/07/2013 Works

SpacesVR BCN

Deployment of our SPACES systems, a virtual reality tool that enables interactive event planning and showcase of venues. ...

Ind Owners & Operators
Concept design and BIM modelling for the Constantine Stadium
Roberto Molinos 20/06/2013 Works

Constantine Stadium

Concept design for a new stadium in Constantine, Algeria, developed in collaboration with SENER. Tasks included bowl scheme, functional prog...

Ind Sports
Design and implementation of a BIM strategy for Ortiz.León around the project of Iberdrola-Scottish Power new headquarters
Sarai Zaballa 13/06/2013 Works

Ortiz-León Arquitectos Corporate

Design and implementation of a BIM strategy for Ortiz.León head office in Madrid around the project of Iberdrola-Scottish Power new headqua...

Ind Architects & Engineers
Development of a parametric model of the roof of la laguna cathedral
Roberto Molinos 01/05/2013 Works

La Laguna Cathedral

Development of a parametric model of the roof in order to keep control of all special arrangements and distortions on the new proposal. This...

Ind Architects & Engineers
BIM implementation and BIM modelling of the architectural and structural project of the MAAT Museum Lisbon
Roberto Molinos 18/04/2013 Works

MAAT Museum Lisbon

BIM implementation and BIM modelling of the architectural and structural project and its complex geometry based on CAD documentation. Modeli...

Ind Architects & Engineers
BIM modelling and 4D simulation for a a 15.000 m² laboratories building
Roberto Molinos 13/03/2013 Works

ELDI Laboratories Building in UPCT

VIAS approached Modelical to review the two-stage construction project of a 15.000 m² laboratories building in Cartagena, south-east of Spa...

Ind Architects & Engineers